|
Post by jimbouk on Oct 13, 2015 14:32:29 GMT -5
Looking good. Not the kind of job I enjoy that one! Are you adding double glazing as well?
|
|
|
Post by jimbouk on Oct 13, 2015 15:08:01 GMT -5
Also I thought you were mainly on new builds? Is this a personal project mate or changed work?
|
|
|
Post by wrightwoodwork on Oct 13, 2015 15:47:58 GMT -5
These are just getting single glazing. The ones at the front are meant to be getting new sashes made which are going to be double glazed. The client keeps getting shocked with the prices. I can do them just I don't have time. When I was apprentice. I used to be in the workshop all the time making the likes of doors and sash and case windows etc. I do mainly work on new builds. I was getting messed about with money so I just jumped. This is an in between job it was meant to be me and the guy I work for. Then the job get held up with the historic Scotland nonsense. So the boss started something else. To the same architects. Which specialises in these properties in Edinburgh. Then into next year go back to doing the new builds. I also have in the past done the commercial type jobs as well. Basically any type of joinery I can do and will do the only thing I don't do is shuttering
|
|
|
Post by mick on Oct 17, 2015 13:52:32 GMT -5
Nice job Aaron It is a long time since I did any work on sash Windows not many of them left in my neck of the woods
|
|
|
Post by wrightwoodwork on Oct 17, 2015 20:27:51 GMT -5
Got the glass into the sash now and puttied up here is a couple of pics of the progress. Will take a pic on Monday of it being puttied up Attachments:

|
|
|
Post by wrightwoodwork on Oct 25, 2015 3:58:26 GMT -5
Well I got some piher maxipress clamps that I'm using to aid pulling up the boards. The best feature on them to me is the handle being able to turn at right angles instead of just inline. Enabling some serious pressure to be applied
|
|
|
Post by wrightwoodwork on Oct 29, 2015 16:00:16 GMT -5
Getting thier with the old dreaded flooring only one room of it left now. Here is some pics of where the hearth is going to go. Not sure what the border name is
|
|
|
Post by wrightwoodwork on Nov 21, 2015 6:37:40 GMT -5
Well still doing floors this one is a nice new engineered oak floor here is a pic of border around the hearth for the fire 
|
|
|
Post by GhostFist on Nov 21, 2015 8:13:35 GMT -5
I know you don't want to hear me say it but I like the look of the old floor. great work on this project. keep us updated.
|
|
|
Post by wrightwoodwork on Nov 21, 2015 8:52:46 GMT -5
It's one of those jobs that people love to look at yet is no fun to do but it looks like it has never being done
|
|
|
Post by wrightwoodwork on Mar 17, 2016 9:48:15 GMT -5
The job is now a joke won't go into to much detail but why do people insist on keeping the shite. Anyway which looks right the left or right on Attachments:
|
|
|
Post by GhostFist on Mar 17, 2016 11:34:41 GMT -5
I'm going to go with the left. I absolutely hate keeping old baseboard it's such a pain and never works right after a reno.
I feel your pain. my show is being singlehandedly run by me, though my credit is assistant head carpenter.
|
|
|
Post by jimbouk on Mar 17, 2016 15:44:20 GMT -5
Personally I'd go the one on the right. Even better if the moulding was slightly smaller in proportion. Hope the job gets better for you mate!
|
|
|
Post by wrightwoodwork on Mar 17, 2016 15:59:49 GMT -5
If they would get rid of the shite the feel of the job would improve. Then they got this dry ice cleaning job to clean the stairs. It has to be the noisiest job I've ever heard I had to walk out. The one on the right is the way I do them the erika was the ideal tool for the task Attachments:
|
|
|
Post by GhostFist on Mar 17, 2016 18:36:46 GMT -5
I said left as it matched existing profile
|
|